?
Your questions answered A solution has to be explainable and defensible within our organisation. We are always available and we take our responsibility
What does cathodic protection, and the decay of concrete, actually involve? Many questions need a clear answer. We welcome them. We have answers. We do not pass the problem on, but are glad to share the information and knowledge we have found and been given
Cluster 1. CP technology S101 What cathodic protection does to your structure S102 Galvanic or ICCP: when do you choose which S103 Why with chloride only CP really stops the corrosion S104 How much current does a CP system need? S105 Cathodic prevention (CPre) Cluster 2. Anodes S201 Anode types side by side: what to use where S202 Service life by anode type S203 Conductive coating: the most widely used anode system in the Netherlands S204 Titanium mesh and ribbon: sprayed concrete, slot or poured overlay S205 Drilled-in anodes: when the surface offers no room S206 Zinc anodes in repair patches S207 Reference electrodes: without a reference cell you can prove nothing S208 The anode follows from the structure, not from the supplier’s list Cluster 3. By structure type S301 CP in car parks S302 CP on corbels, galleries and balconies S303 CP on beam ends and abutments S304 CP on bridge and viaduct decks S305 CP in tunnels S306 CP on quay walls, jetties and in the splash zone S307 CP in swimming pools S308 CP on heritage and listed buildings S309 CP on steel in masonry and natural stone S310 Why CP is standard in German car parks and not yet here Cluster 4. Our own product line S401 Power sources: what a CP power supply has to be able to do S402 Remote monitoring: from data logger to cloud S403 Voeding zonder vaste aansluiting: zonnepanelen, accu's en nachtstroom S404 What else is in a CP system S405 ZINGA film galvanising: what it is and when it fits S406 ZINGA in practice: 29 years on the Kalvøya bridge S407 Dew point sensor: painting within the standard, without manual work Cluster 5. Work preparation S501 Your first CP project: what you want ready before you call S502 What you set out before contract award S503 CP on steel: sheet piling, tanks and pipelines Choose a question on the left.